The following are consulting projects in which I have participated. The contact information has been included as related to the client at the time of service. Therefore, it may be somewhat outdated, particularly for projects conducted several years ago. Projects completed in the years before 2008 occurred prior to the formation of Earth Resources Analytic, LLC. My services before 2008 were rendered as a free-lance consultant in association with another consulting firm. Technically, only the clients listed for projects from 2008 to present are specifically related to ERA, LLC.


Elstad vs ND State Water Commission

  • Description: Review of salinization claims and data along the Devils Lake Emergency Outlet
  • Location: Sec. 4 and 9, T157N, R68W, Benson Co., ND
  • Completion date: May 2009
  • Client name: ND State Water Commission, Bismarck, ND
  • Client contact: Mr. Howard Swanson; Letnes, Marshall, Swanson, & Warcup, Grand Forks

Monson vs Zenergy, Inc.

  • Description: Data review and recommendations related to damages from a salt water spill
  • Location: Sec. 33, T150N, R102W, McKenzie Co., ND
  • Completion date: December 2007
  • Client name: Ms. Linda and Mr. Jesse Monson
  • Client contact: Mr. Derrick Braaten, Sarah Vogel Law Firm, Bismarck, ND (701) 221-2911


Grand Forks landfill (Rye Township) SPGM inspection and management plan review

  • Description: Field inspection of SPGM removal and recommendations for managent plan
  • Location: Sec. 13, Rye Township, Grand Forks Co., ND
  • Completion date: October 2009
  • Client name: City of Grand Forks, Grand Forks, ND
  • Client contact: Mr. Todd Feland, City of Grand Forks (701) 740-0739
  • Client contact2: Mr. Scott Martin, Burns and McDonnell Engineering, Inc. (816) 333-9400

Expert witness: Gess-Hye, Inc. vs Schlosser-Topp

  • Description: Soil damage opinion due to erosion on 1200 acres of land
  • Location: Sec. 33, T140N, R62W, Stutsman Co., ND
  • Completion date: January 2009
  • Client name: T-T Ranch, Graceville, ND
  • Client contact: Mr. Roger Minch; Serland Law Firm, Fargo, ND (701) 232-8957

Grand Forks landfill permit area soil resources study (Rye Township)

  • Description: Order 1 soil survey and recommendations for SPGM management on 640 acres
  • Location: Sec. 13, Rye Township, Grand Forks Co., ND
  • Completion date: August 2008
  • Client name: Burns and McDonnell Engineering, Inc., Kansas City, MO
  • Client contact: Mr. Tom Brown (816) 822-3123 and Mr. Scott Martin (816) 333-9400

Topp soil erosion study

  • Description: Soil investigation for erosion damage to crop production on 200 acres
  • Location: Sec. 33, T140N, R62W, Stutsman Co., ND
  • Completion date: July 2008
  • Client name: T-T Ranch, Graceville, ND
  • Client contact: Justin Topp (701) 674-3119

Cinnamon Creek 1-16H proposed oil well pad soil study

  • Description: Order 1 soil investigation for eventual oil well pad restoration on 3 acres
  • Location: Sec. 16, T145N, R102W, McKenzie Co., ND
  • Completion date: December 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Sugar facility ash landfill soil organic matter study

  • Description: Soil investigation for soil organic matter content on a 40 acre landfill area
  • Location: Sec. 20, T146N, R50W, Trail Co., ND
  • Completion date: April 2007
  • Client name: Wenck Associates, Inc., Maple Plain, MN
  • Client contact: Mr. Tony Rohs (763) 479-4228

Boxcar Butte South Federal 10-22H proposed oil well pad soil study

  • Description: Order 1 soil investigation for oil well pad (3 ac) and road access restoration
  • Location: Sec. 22, T148N, R102W, McKenzie Co., ND
  • Completion date: February 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Boxcar Butte South Federal 1-26H proposed oil well pad soil study

  • Description: Order 1 soil investigation for oil well pad (3 ac) and road access restoration
  • Location: Sec. 26, T148, R102W, McKenzie Co., ND
  • Completion date: February 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Squaw Gap State 4-36H proposed oil well pad soil study

  • Description: Order 1 soil investigation for oil well pad (3 ac) and road access restoration
  • Location: Sec. 36, T146N, R105, McKenzie Co., ND
  • Completion date: February 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Summit State 1-32H proposed oil well pad soil study

  • Description: Order 1 soil investigation for oil well pad (3 ac) and road access restoration
  • Location: Sec. 32, T143N, R102W, Billings Co., ND
  • Completion date: February 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Williamson Federal 2-26H proposed oil well pad soil study

  • Description: Order 1 soil investigation for oil well pad (3 ac) and road access restoration
  • Location: Sec. 26, T143N, R103W, Golden Valley Co., ND
  • Completion date: February 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Bicentennial Federal 1-28H proposed oil well pad soil study

  • Description: Order 1 soil investigation for oil well pad (3 ac) and road access restoration
  • Location: Sec. 28, T145N, R103W, McKenzie Co., ND
  • Completion date: February 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Boxcar Butte South Federal 11-22H proposed oil well pad soil study

  • Description: Order 1 soil investigation for oil well pad (3 ac) and road access restoration
  • Location: Sec. 22, T148N, R102W, McKenzie Co., ND
  • Completion date: February 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Ash Coulee 1-2H and 2-2H proposed oil well pad soil study

  • Description: Order 1 soil investigation for 2 oil well pads (5.5 ac) and road access restoration
  • Location: Sec. 2, T142N, R102W, Billings Co., ND
  • Completion date: February 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Roosevelt 22-5 proposed oil well pad soil study

  • Description: Order 1 soil investigation for oil well pad (3 ac) and road access restoration
  • Location: Sec. 5, T142N, R102W, Billings Co., ND
  • Completion date: February 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Summit State 13-34HZ proposed oil well pad study

  • Description: Order 1 soil investigation for oil well pad (3 ac) and road access restoration
  • Location: Sec. 34, T141N, R102W, Billings Co., ND
  • Completion date: February 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Buckhorn Federal 1-21H & Alt. proposed oil well pad study

  • Description: Order 1 soil investigation for 2 oil well pads (6 ac) and road access restoration
  • Location: Sec. 21 and 22, T144N, R102W, Billings Co., ND
  • Completion date: February 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Summit State 26-34 proposed oil well pad study

  • Description: Order 1 soil investigation for oil well pad (3 ac) and road access restoration
  • Location: Sec. 34, T141N, R102W, Billings Co., ND
  • Completion date: February 2007
  • Client name: Summit Resources, LTD, Calgary, Alberta, Canada
  • Client contact: Mr. Geoffrey Lindsay (403) 290-3600

Dakota Municipal landfill permit soil resources study II.

  • Description: Order 1 soil survey and recommendations for SPGM management on 50 acres
  • Location: Sec. 10, T132N, R56W, Sargent Co., ND
  • Completion date: July 2006
  • Client 1: Dakota municipal landfill, Gwinner, ND
  • Client 2: Waste Management, Inc., Englewood, CO
  • Client 1 contact: Mr. Kim Beckstrom (701) 678-2306
  • Client 2 contact: Mr. Tom Schweitzer, tschweit@wm.com

West Fargo inert landfill soil resources study

  • Description: Order 1 soil survey and recommendations for SPGM management on 15 acres
  • Location: Sec. 2, T139N, R50W, Cass Co., ND
  • Completion date: July 2004
  • Client: City of West Fargo, ND
  • Client contact: Mr. Barry Johnson (701) 306-8483

McDaniel landfill soil resources study

  • Description: Order 1 soil survey and recommendations for SPGM management on 20 acres
  • Location: Sec. 24, T152N, R82W, Ward Co., ND
  • Completion date: September 2002
  • Client 1: McDaniel landfill, Sawyer, ND
  • Client 2: Waste Management, Inc., Englewood, CO
  • Client 1 contact: Mr. Kevin Solie (701) 328-5166
  • Client 2 contact: Mr. Tom Schweitzer, tschweit@wm.com

Missouri River Sanitation inert landfill soil quality study

  • Description: Spoil piles sampled and compared to topsoil pile and covered cell on 40 acres
  • Location: Sec. 23, T146N, R82W, McLean Co., ND
  • Completion date: September 2002
  • Client 1: Missouri River Sanitation inert landfill, Underwood, ND
  • Client 2: Waste Management, Inc., Englewood, CO
  • Client 1 contact: Mr. Kim Beckstrom (701) 678-2083
  • Client 2 contact: Mr. Tom Schweitzer, tschweit@wm.com

Jahner municipal waste landfill soil resources study

  • Description: Order 1 soil survey and recommendations for SPGM management on 95 acres
  • Location: Sec. 8, T132N, R72W, McIntosh Co., ND
  • Completion date: September 2002
  • Client 1: Jahner municipal waste landfill, Wishek, ND
  • Client 2: Waste Management, Inc., Englewood, CO
  • Client 1 contact: Mr. John Ibach (701) 452-2666
  • Client 2 contact: Mr. Tom Schweitzer, tschweit@wm.com

Bismarck municipal landfill soil resources study

  • Description: Order 1 soil survey and recommendations for SPGM management on 600 ac
  • Location: Sec. 25, T139N, R80W and Sec. 30, T139N, R79W, Burleigh Co., ND
  • Completion date: September 2002
  • Client: City of Bismarck, ND
  • Client contact: Mr. Keith Hunke (701) 222-6431

Fargo municipal landfill soil resources study

  • Description: Order 1 soil survey and recommendations for SPGM management on 30 acres
  • Location: Sec. 4, T139N, R49W, Cass Co., ND
  • Completion date:Client 1: Jahner municipal waste landfill, Wishek, ND July 2002
  • Client 1: Fargo municipal landfill, Fargo, ND
  • Client 2: Wenck Assoc., Inc., Maple Plain, MN
  • Client 1 contact: Mr. Bruce Grubb (701) 241-1525
  • Client 2 contact: Mr. Tony Rohs (763) 479-4228

Dakota Municipal landfill permit soil resources study I.

  • Description: Order 1 soil survey and recommendations for SPGM management on 80 acres
  • Location: Sec. 10, T132N, R56W, Sargent Co., ND
  • Completion date: October 2000
  • Client 1: Dakota municipal landfill, Gwinner, ND
  • Client 2: Waste Management, Inc., Englewood, CO
  • Client 1 contact: Mr. Kim Beckstrom (701) 678-2306
  • Client 2 contact: Mr. Tom Schweitzer, tschweit@wm.com

Reidle vs ND Dept. of Transportation

  • Description: Soil assessment for damages related to a construction borrow area of 30 acres
  • Location: Sec. 19, T151N, R94W, McKenzie Co., ND
  • Completion date: December 1999
  • Client: ND Dept. of Transportation
  • Client 1 contact: Mr. Doug Gigler, Nilles, Hansen & Davies, LTD, (701) 237-5544
  • Client 2 contact: Mr. Andrew Moraghan, Office of Attorney General, (701) 328-3640

Soil resources study for mineland reclamation II., Coteau Mine

  • Description: Order 1 soil survey for SPGM reference on 320 acres
  • Location: Sec. 28, T145N, R87W and Sec. 15, T145N, R86W, Mercer Co., ND
  • Completion date: July 1999
  • Client name: The Coteau Properties Co., Beulah, ND
  • Client contact: Mr. George Hawkey

Grand Forks landfill permit soil resources study (Turtle River Township)

  • Description: Order 1 soil survey and recommendations for SPGM management on 640 acres
  • Location: Sec. 19 Turtle River Township, Grand Forks Co., ND
  • Completion date: March 1999
  • Client name: Burns and McDonnell Engineering, Inc., Kansas City, MO
  • Client contact: Mr. Tom Brown (816) 822-312

Soil resources study for mineland reclamation I., Coteau Mine

  • Description: Order 1 soil survey and recommendations for SPGM management on 360 acres
  • Location: Sec. 26 and 35, T146N, R88W, Mercer Co., ND
  • Completion date: November 1998
  • Client name: The Coteau Properties Co., Beulah, ND
  • Client contact: Mr. George Hawkey


CP railroad upgrade Carrington wetland delineation

  • Description: Soils oversight of wetland delineation along a ROW corridor
  • Location: Richland Co, ND
  • Completion date: November 2013
  • Client name: Houston Eng., Inc., Fargo, ND
  • Client contact: Ms. Emmy Baskerville (763) 493-4522 / Mr. Mark Aanenson (701) 237-5065

CP railroad upgrade Hankinson - Fairmount wetland delineation

  • Description: Soils oversight of wetland delineation along a ROW corridor
  • Location: Richland Co, ND
  • Completion date: November 2013
  • Client name: Houston Eng., Inc., Fargo, ND
  • Client contact: Ms. Emmy Baskerville (763) 493-4522 / Mr. Mark Aanenson (701) 237-5065

BNSF railroad upgrade Judson - Hebron wetland delineation

  • Description: Soils oversight of wetland delineation along two ROW corridors
  • Location: Morton Co, ND
  • Completion date: October 2013
  • Client name: ERO, Inc., Denver, ND
  • Client contact: Ms. Denise Larson (303) 830-1188

NDDOT HW-5 Cavalier wetland delineation

  • Description: Soils oversight of wetland delineation along a highway right-of-way
  • Location: Pembina Co., ND
  • Completion date: July 2013
  • Client name: Widseth Smith Nolting & Associates, Inc., East Grand Forks, MN
  • Client contact: Mr. Ethan Harvey (218) 316-3685 / Mr. Brad Bail (218) 773-5621

BNSF railroad upgrade Berthold wetland delineation

  • Description: Soils oversight of wetland delineation along a ROW corridor
  • Location: Ward Co, ND
  • Completion date: July 2013
  • Client name: Houston Eng., Inc., Fargo, ND
  • Client contact: Ms. Emmy Baskerville (763) 493-4522 / Mr. Mark Aanenson (701) 237-5065

BNSF railroad upgrade Lakota - Michigan wetland delineation

  • Description: Soils oversight of wetland delineation along 1 mile of railroad ROW
  • Location: Nelson Co, ND
  • Completion date: November 2012
  • Client name: Houston Engineering, Inc., Fargo, ND
  • Client contact: Mr. Mark Aanenson (701) 237-5065

Calumet Refinery wetland delineation

  • Description: Soils oversight of wetland delineation at a site of 480 acres
  • Location: Stark Co., ND
  • Completion date: October 2012
  • Client name: Western Ecosystems Technology, Inc., Bismarck, ND
  • Client contact: Mr. Clayton Derby (701) 250-1756

NRCS wetland delineaton

  • Description: Soils oversight of wetland delineation on 142 sites encompassing 1,565 acres
  • Location: Ransom and Cass Co, ND
  • Completion date: December 2012 
  • Client name: MFRA, Inc., Plymouth, MN
  • Client contact: Mr. Todd Ullom (763) 259-6015

Spirit Lake Headstart building site wetland delineation

  • Description: Soils oversight of wetland delineation on a 40 site
  • Location: Spirit Lake Indian Reservaton, Benson Co, ND
  • Completion date: October 2012 
  • Client name: Houston Engineering, Inc., Fargo, ND
  • Client contact: Mr. Mark Aanenson (701) 237-5065

Bear Den pipeline wetland delineation

  • Description: Soils oversight of wetland delineation along a linear corridor of about 62 miles
  • Location: Dunn and McKenzie Co., ND
  • Completion date: October 2012
  • Client name: Western Ecosystems Technology, Inc., Bismarck, ND
  • Client contact: Mr. Clayton Derby (701) 250-1756

Ward Co road upgrade wetland delineation

  • Description: Soils oversight of wetland delineation at 13 road sites
  • Location: Ward Co, ND
  • Completion date: ongoing 
  • Client name: Houston Engineering, Inc., Fargo, ND
  • Client contact: Mr. Mark Aanenson (701) 237-5065

BNSF upgrade Devils Lake - Churches Ferry wetland delineation

  • Description: Soils oversight of wetland delineation along 15 miles of railroad ROW
  • Location: Benson and Ramsey Co, ND
  • Completion date: May 2012
  • Client name: Houston Engineering, Inc., Fargo, ND
  • Client contact: Mr. Mark Aanenson (701) 237-5065

NDDOT Binford Highway 1 wetland delineation

  • Description: Soils oversight of wetland delineation along 1/2 mile of highway right-of-way
  • Location: Sec. 28, T147N, R60W, Griggs Co., ND
  • Completion date: November 2011
  • Client name: Widseth Smith Nolting & Associates, Inc., Baxter, MN
  • Client contact: Mr. Ethan Harvey (218) 316-3685

Tioga - Sherwood pipeline wetland delineation

  • Description: Soils oversight of wetland delineation along a linear corridor of about 80 miles
  • Location: Williams, Mountrail, Burke, Ward and Renville Co., ND
  • Completion date: July 2012
  • Client name: Western Ecosystems Technology, Inc., Bismarck, ND
  • Client contact: Mr. Clayton Derby (701) 250-1756

Pembina, port of entry, windturbine wetland delineation

  • Description: Soils oversight of wetland delineation on a 20 acre tract
  • Location: Sec. 28, T164N, R61W, Pembina Co., ND
  • Completion date: June 2010
  • Client name: ERO Resources Corp., Denver, CO
  • Client contact: Ms. Moneka Worah (303) 830-1188 and Ms. Aleta Powers (970) 872-3020

NDDOT HW-281 Churches Ferry wetland delineation

  • Description: Soil investigation for wetland delineation along 6 miles of highway ROW
  • Location: T156N, R66W, Ramsey Co, ND
  • Completion date: October 2009
  • Client name: Houston Engineering, Inc., Fargo, ND
  • Client contact: Mr. Mark Aanenson (701) 237-5065

NDDOT I-29 Argusville wetland delineation

  • Description: Soil investigation for wetland delineation along 5 miles of highway ROW
  • Location: Harwood Township, Cass Co., ND
  • Completion date: September 2009
  • Client name: Houston Engineering, Inc., Fargo, ND
  • Client contact: Mr. Mark Aanenson (701) 237-5065

USDOT Turtle Mt. reservation road and transit facility wetland delineation

  • Description: Soil investigation for wetland delineation along 13 mi of road ROW 30 acre tract
  • Location: T162N, R70W & T162N, R71W, Rollette Co., ND (Turtle Mt Reservation)
  • Completion date: June 2009
  • Client name: McCain and Assoc., Inc., Bismarck, ND
  • Client contact: Mr. Greg Meyer (701) 255-1475 ext 4

Expert witness: Stock wetland violation USDA appeal

  • Description: Wetland soil fill opinion related to data from NRCS investigation
  • Location: Sec. 21 Western Township, Ottertail Co., MN
  • Completion date: January 2009
  • Client name: Mr. David Stock
  • Client contact: Mr. Mark Aaneson, Houston Engineering, Inc. (701) 237-5065

NDDOT I-29 Harwood wetland delineation

  • Description: Soil investigation for wetland delineation along 5 miles of interstate ROW
  • Location: Reed Township, Cass Co., ND
  • Completion date:  September 2008
  • Client name: Houston Engineering, Inc., Fargo, ND
  • Client contact: Mr. Mark Aanenson (701) 237-5065

NDDOT English Coulee wetland delineation

  • Description: Soil investigation for wetland delineation along a linear drain 1 mile in length
  • Location: Sec. 5, Grand Forks Township, Grand Forks Co., ND
  • Completion date: August 2008
  • Client name: Houston Engineering, Inc., Fargo, ND
  • Client contact: Mr. Mark Aanenson (701) 237-5065

Pillsbury transmission line wetland delineation

  • Description: Soil investigation for wetland delineation along a 70 mile - 200 ft corridor
  • Location: From Pillsbury, ND in Barnes Co. to West Fargo, ND in Cass Co.
  • Completion date: May 2008
  • Client name: McCain and Associates, Inc., Bismarck, ND
  • Client contact: Mr. Greg Meyer (701) 255-1475 ext 4

Jelinek wetland delineation

  • Description: Soil investigation for hydric soil in a 5 acre farmed wetland
  • Location: Sec. 8, T131N, R51W, Richland Co., ND
  • Completion date: May 2008
  • Client name: Darrell Jelinek, Mantador, ND
  • Client contact: Mr. Mark Aanenson, Houston Engineering, Inc., Fargo, ND  (701) 237-5065

Golden Lake wetland delineation (additional review)

  • Description: Additional review of data from a hydric soil investigation
  • Location: Sec. 10, T147N, R55W, Steele Co., ND
  • Completion date: March 2008
  • Client name: Mr. Scott Cranston, Valley Land Investments, Hatten, ND
  • Client contact: Mr. Brett Brudvick, Ohnstad-Twichell Law, Mayville, ND (701) 788-3251

NDDOT South 48th Street, Grand Forks wetland delineation

  • Description: Soil investigation for wetland delineation along 4 miles of I-29 and other roads
  • Location: Sec. 18, Grand Forks Township, Grand Forks Co., ND
  • Completion date: October 2007
  • Client name: Houston Engineering, Inc., Fargo, ND
  • Client contact: Mr. Mark Aanenson (701) 237-5065

USDOT Camp Grafton - Spirit Lake reservation highway ROW wetland delineation

  • Description: Soil investigation for wetland delineation along 16 miles of highway ROW
  • Location: Camp Grafton and Spirit Lake reservation in ND
  • Completion date: September 2007
  • Client name: ERO Resources Corp., Denver, CO
  • Client contact: Mr. Clint Henke (303) 830-1188 and Ms. Aleta Powers (970) 872-3020

Rolling Thunder wind turbine project wetland reconnaissance

  • Description: Wetland location reconnaissance for proposed a 23 miles 600 ft corridor
  • Location: Hand Co., SD
  • Completion date: August 2007
  • Client name: Tetra Tech EC, Lakewood, CO
  • Client contact: Mr. Mark Griswold (303) 980-3665 and Ms. Laura Miller (503) 721-7218

Golden Lake wetland delineation

  • Description: Soil investigation for hydric properties around a 15 acre farmed wetland
  • Location: Sec. 10, T147N, R55W, Steele Co., ND
  • Completion date: July 2007
  • Client name: Mr. Scott Cranston, Valley Land Investments, Hatten, ND
  • Client contact: Mr. Brett Brudvick, Ohnstad-Twichell Law, Mayville, ND (701) 788-3251

Northern Plains wind farm hydric soils determination

  • Description: Indoor geologic boring description for hydric indicators from 27 sites
  • Location: T131N, R71W; T131N, R72W; and T130N, R72W, McIntosh Co., ND
  • Completion date: March 2007
  • Client name: ERM-Southwest, Inc., Houston, TX
  • Client contact: Mr. Phil Ponebshek (512) 374-2247

Keystone pipeline corridor wetland delineation

  • Description: Soil investigation for wetland delineation in a 300 ft corridor 135 miles long
  • Location: Cavalier, Walsh, Nelson, Steele, and Barnes Co., ND
  • Completion date: July 2006
  • Client name: ENSR, Fort Collins, CO
  • Client contact: Mr. Scott Ellis (970) 493-8878

Churches Ferry wetland delineation

  • Description: Soil investigation for hydric properties in farmed wetlands on a 560 acre site
  • Location: Sec. 12 and 13, T155N, R67W, Benson Co., ND
  • Completion date: July 2006
  • Client name: Ulteig Engineers, Inc., Fargo, ND
  • Client contact: Mr. Jon Scraper (701) 280-8587 

Burkel turkey farm wetland delineation

  • Description: Soil investigation for hydric properties in farmed wetlands on a 640 acre site
  • Location: Sec. 29, T133N, R52W, Richland Co., ND
  • Completion date: July 1999
  • Client name: Farm Credit Service, North Dakota


Mercer-Oliver joint irrigation project soil resources study

  • Description: Soil review for suitability to irrigation on 88,600 acres
  • Location: Mercer and Oliver Counties, ND
  • Completion: March 2000
  • Client name: Bartlett & West Engineers, Inc., Bismarck, ND
  • Client contact: Mr. Ken Royse (701) 258-1110

Horsehead irrigation project soil resources study

  • Description: Soil review for suitability to irrigation on 65,000 acres
  • Location: Emmons County, ND
  • Completion: March 1999
  • Client name: Bartlett & West Engineers, Inc., Bismarck, ND
  • Client contact: Mr. Ken Royse (701) 258-1110


Binstock subdivision soil investigation

  • Description: Soil survey for septic system suitability for multiple dwellings on 20 acres
  • Location: Sec. 30 Reed Township, Cass Co., ND
  • Completion: July 2009
  • Client name: Mr. Eric Binstock, West Fargo, ND
  • Client contact: Mr. Eric Binstock (701) 281-7906

Ott soil investigation

  • Description: Soil survey for septic system suitability for a single family dwelling 10 acres
  • Location: Sec. 12, Eldred Township, Cass County
  • Completion: September, 2008
  • Client name: Mr. Lucas Ott, Wheatland, ND
  • Client contact: Mr. Lucas Ott (701) 797-7178

Irwin soil investigation

  • Description: Soil survey for septic system suitability for a a single family dwelling 10 acres
  • Location: Sec. 25, T146N, R51W, Trail County
  • Completion: July 2008
  • Client name: Mr. Gordon Irwin
  • Client contact: Mr. Chad Priewe, Alerus Property Management, Fargo, ND (701) 280-5093

Knudsvig soil investigation

  • Description: Soil survey for septic system suitability for a single family dwelling 10 acres
  • Location: Sec. 19, T145N, R52W, Trail County
  • Completion: May 2008
  • Client name: Mr. Keith Knudsvig
  • Client contact: Mr. Gary Leraas, Coldwell Banker First Realty, Fargo, ND (701) 430-1775

L. Steinberger soil investigation

  • Description: Soil survey for septic system suitability for a single family dwelling 10 acres
  • Location: Sec. 30, Harwood Township, Cass Co., ND
  • Completion: May 2008
  • Client name: Mr. Luke Steinberger, Harwood, ND
  • Client contact: Mr. Luke Steinberger (701) 668-2973

A. Steinberger soil investigation

  • Description: Soil survey for septic system suitability for a single family dwelling 10 acres
  • Location: Sec. 14, Gardner Township, Cass Co., ND
  • Completion: May 2008
  • Client name: Mr. Andy Steinberger, Argusville, ND
  • Client contact: Mr. Andy Steinberger andysteinberger@hotmail.com

Carlson-Lueke soil investigation

  • Description: Soil survey for septic system suitability for two single family dwellings 10 acres
  • Location: Sec. 35, Pleasant Township, Cass Co., ND
  • Completion: April 2008
  • Client name: Mr. Aaron Carlson and Lenny Lueke
  • Client contact: Mr. Aaron Carlson (701) 793-6950 and Mr. Lenny Lueke (701) 371-5829

Mandan subdivision soil investigation

  • Description: Order 1 soil investigation for septic system suitability for multiple dwellings 80ac
  • Location: Sec. 17, T139N, R83W, Morton Co., ND
  • Completion: August 2007
  • Client name: Mr. Jim Wolf, Mandan, ND
  • Client contact: Mr. Carl Vender, Interstate Engineering, Mandan, ND (701) 663-5455

Homestead Acres development soil investigation

  • Description: Order 1 soil investigation for septic system suitability for multiple dwellings 15ac
  • Location: Sec. 4 and Sec. 9, T146N, R87W, Mercer Co., ND
  • Completion: May 2007
  • Client name: Mercer County Commission, ND
  • Client contact: Mr. Richard Sorenson, Mercer Co. Land Use Administrator  (701) 745-3695

Solseng soil investigation

  • Description: Soil survey for septic system suitability for a single family dwelling 10 acres
  • Location: Sec. 3, Raymond Township, Cass Co., ND
  • Completion: August 2002
  • Client name: Mr. Elton Solseng, Harwood, ND
  • Client contact: Mr. Elton Solseng (701) 282-0387

Holmen Subdivision soil investigation

  • Description: Order 1 soil investigation for septic system suitability for multiple dwellings 40ac
  • Location: Sec. 30, Stanley Township, Cass Co., ND
  • Completion: September 2001
  • Client name: Mr. Dennis Holmen, Horace, ND
  • Client contact: Mr. Dennis Holmen (701) 282-6144

Fiebiger soil investigation

  • Description: Soil survey for septic system suitability for a single family dwelling 2 acres
  • Location: Sec. 8, Everest Township, Cass Co., ND
  • Completion: September 2000
  • Client name: Ms. Emma Fiebiger
  • Client contact: Ms. Shirley Hodgson, PO Box 272, Casselton, ND

Roy soil investigation

  • Description: Soil survey for septic system suitability for a single family dwelling 2 acres
  • Location: Sec. 12, Gill Township, Cass Co., ND
  • Completion: May 2000
  • Client name: Mr. Brian Roy
  • Client contact: Mr. Brian Roy, 3715 15th Ave., Wheatland, ND

DeVault soil investigation

  • Description: Soil survey for septic system suitability for a single family dwelling 2 acres
  • Location: Sec. 34, Raymond Township, Cass Co., ND
  • Completion: May 2000
  • Client name: Mr. Forest DeVault
  • Client contact: Mr. Forest DeVault, 3593 166 1/4 Ave., Mapleton, ND

Donegan soil investigation

  • Description: Soil survey for septic system suitability for a single family dwelling 10 acres
  • Location: Sec. 5, Reed Township, Cass Co., ND
  • Completion: May 2000
  • Client name: Mr. Roger Donegan
  • Client contact: Mr. Roger Donegan (701) 261-0622



 
   
Top